Difference between revisions of "Test Analyst Log"

From OpenEMR Project Wiki
m (1 revision: second)
(No difference)

Revision as of 07:46, 26 August 2011

The laboratory Director is required to maintain over quality in a laboratory. This includes verifying that a technician has the background and training to perform the testing required. He/she must then document initial and following training on a particular analyzer. The normal schedule of these events are as follows.

Initial training

3 month follow up

6 month follow up

12 month follow up

annual follow up

signature and initial