Difference between revisions of "QA and Release Process"

From OpenEMR Project Wiki
Line 27: Line 27:
===Bugs/Issues===
===Bugs/Issues===
:*[[Active_Projects#Datafield_Max_Length_Bug|Forms datafield length bug (forced 255 input limit)]] (<span style='color:red'>?????</span>)
:*[[Active_Projects#Datafield_Max_Length_Bug|Forms datafield length bug (forced 255 input limit)]] (<span style='color:red'>?????</span>)
:*Ensure compatible with MySQL version 5.5 (for example, it appears unable to install new forms in MySQL 5.5) (<span style='color:red'>?????</span>)


===Bugs/Issues Fixed===
===Bugs/Issues Fixed===

Revision as of 08:48, 18 May 2012

Version 4.1.1

Overview

The current plan is to get the pending new features and bug fixes completed by 5/1/2012 5/14/2012 6/1/2012. Then plan about 4 weeks of testing before going ahead with the release. If everything goes as planned (note it generally never does :) ), will potentially release OpenEMR 4.1.1 sometime in June June/July.

Testing vehicles

Features Pending

  • Support multisite module in the ubuntu package (Brady)
  • Ensure 5010 support is complete (Not sure if this is done???)
  • INNODB conversion (Likely defer to next version)

Features Wishlist

Features Completed

  • CouchDB support to store patient documents (COMPLETED 5/9/2012) (Z&H)
  • Practice Management enhancements (migration of copay out of billing sql table) (COMPLETED 4/28/2012) (Z&H)

Bugs/Issues

Bugs/Issues Fixed

  • Fix primary/referring provider ambiguity (FIXED 5/8/12) (Brady)
  • Audit engine needs to log binded variables (FIXED 4/14/12) (Brady)
  • Language editor gui needs to be fixed (FIXED 4/11/12) (Kevin)

Documentation

Translations

  • Update Translation set (COMPLETED - 4/14/12) (Brady)
  • Update Translation set again after code freeze (Brady)
  • Finalize Translations


Version 4.1

RELEASE IS FINISHED. OPENEMR 4.1 WAS RELEASED ON 9/23/2011.
KEEPING BELOW FOR ONLY HISTORICAL PURPOSES

Testing vehicles

Online demo:
Daily built packages:

Bugs/Issues Pending

Bugs/Issues Fixed and Closed

Documentation

Translations

  • Update Translation set (COMPLETED 9/11)
  • Finalize Translations (COMPLETED 9/16)