Test Analyst Log

From OpenEMR Project Wiki
Revision as of 21:11, 24 April 2012 by Bradymiller (talk | contribs) (1 revision: Test_Analyst_Log)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)

The laboratory Director is required to maintain over quality in a laboratory. This includes verifying that a technician has the background and training to perform the testing required. He/she must then document initial and following training on a particular analyzer. The normal schedule of these events are as follows.

Initial training

3 month follow up

6 month follow up

12 month follow up

annual follow up

signature and initial