Test Analyst Log

From OpenEMR Project Wiki
The printable version is no longer supported and may have rendering errors. Please update your browser bookmarks and please use the default browser print function instead.

The laboratory Director is required to maintain over quality in a laboratory. This includes verifying that a technician has the background and training to perform the testing required. He/she must then document initial and following training on a particular analyzer. The normal schedule of these events are as follows.

Initial training

3 month follow up

6 month follow up

12 month follow up

annual follow up

signature and initial