Test Analyst Log

From OpenEMR Project Wiki

The laboratory Director is required to maintain over quality in a laboratory. This includes verifying that a technician has the background and training to perform the testing required. He/she must then document initial and following training on a particular analyzer. The normal schedule of these events are as follows.

Initial training

3 month follow up

6 month follow up

12 month follow up

annual follow up

signature and initial